Trails and Recreation
Cusick Park and Boat Ramp; Cusick, Washington
Century West provided design
and construction services for this park located next to the
Pend Oreille River. The project includes a boat launch facility
with handling docks, a parking lot, restroom, picnic shelter,
and pedestrian paths. Century West provided full construction
management services, including observation, contract and grant
management.
Palouse River Pathway Project, Colfax, Washington
Century West provided design
and construction management for this 8-foot paved path that is
located on the top of the flood control dike along the Palouse
River. The project included the paved path, benches, and trash
receptacles. T he project was funded through the Federal
Highways. Century West provided plan review, environmental
documentation coordination with the Town, WSDOT, and the
public.
SR 27 to Downtown Pedestrian Path; Fairfield, Washington
Century West became involved
in this project in the planning stage. We provided a grant
application to the town for ISTEA funding. The project was
selected through the Spokane Regional Transportation Council
for funding. Century West submitted the project for TIB
matching funds. These funds were secured making the project
100% grant funded.
Century West then provided design of the project. The project included constructing a paved pedestrian pathway through the town’s park and a precast concrete bridge crossing with cast-in-place abutments and hand railing. The 6 foot wide pedestrian path and pedestrian bridge crossing Rattler’s Run Creek connects one of the town’s main arterials and State Highway 27 with the downtown business area. It is an important link for pedestrian and bicycle traffic traveling to and from the town’s northeast residential areas. Century West provided full grant administration and secured all required permits throughout the project. During construction, our firm provided contract and grant administration as well as materials testing, construction observation, and surveying.
Tekoa Pedestrian Bridge; Tekoa, Washington
Century West provided FEMA Grant
administration, design, and construction management for this
pedestrian bridge replacement. This 60-foot span foot bridge
was damaged beyond repair by flooding in 1996. Steel members
and supports were removed and replaced with new "W" beams and
cross bracing. The existing abutments were used and the City
replaced the hand railing to meet UBC requirements. Century
West assisted the City throughout the project and acquired
additional grant funds through FEMA to complete the project.
Wilson Cr
eek Nature Trail;
Wilson Creek, Washington
Century West provided design and construction management for this 8-foot paved path that is located on the top of the flood control dike along Wilson Creek. The project included the paved path, interpretive signs, benches, trash receptacles, and pedestrian shelters. The project was funded through the Federal Highways. Century West provided plan review, environmental documentation coordination with the Town, WSDOT, and the public.
Aviation I Evironmental I Site Development I Stormwater Treatment & Conveyance I Transportation Improvements I Wastewater Conveyance I Water Distribution I Back to Projects