Hillsboro Airport, Taxiway C Extension

Hillsboro, Oregon

Century West worked with the Port of Portland to design the extension of Taxiway C at Hillsboro Airport. The project was the first phase of a multi-phase improvement plan that will ultimately connect to a third runway at the airport. The project included construction of a 3000’x35’ taxiway (parallel to RW 2-20), a taxiway edge light system, pavement underdrains, and surface drainage improvements. Century West conducted environmental coordination (for drainage work), prepared plans, specifications, and cost estimates for the project.