Troutdale Airport, Taxiway B Relocation, Environmental and Engineering Services

Troutdale, Oregon

Century West worked with the Port of Portland to design the relocation of Troutdale Airport’s South Parallel Taxiway, Taxiway B. The 5400’ x 35’ wide taxiway has been relocated to provide proper separation from Runway 7–25. The project included the construction of a PAPI for the Runway 25 approach, reconstruction of Taxiway B (5,400’ x 35’), reconstruction of 7 connector taxiways, demolition of four buildings, abandoning of an existing well, site grading, and drainage improvements. Century West was responsible for environmental work, preparing plans, specifications, and cost estimates for the project.