H2 Lift Station Replacement

Hayden, Idaho

Century West was part of an engineering team for this large Hayden, Idaho commercial development project. Century West provided design and construction management services for a new Gorman-Rupp, wet-well mounted, self priming, triplex pump station. The system included an 18-foot deep cast-in-place concrete wet well, centrifugal pump system, new gravity and force main connections, odor control system, 20K gallon emergency storage vault, emergency backup generator and SCADA system. Design challenges included the presence of three other lift stations which share two force mains into which the H2 lift station discharges and force main piping connections to accommodate multiple flow scenarios.